ifctoolkit Practical tools, better compliance.

PRACTICAL TOOLS, BETTER COMPLIANCE.

Documentation

Find practical guidance for preparing IFC files, running checks, reviewing results, and using extracted data to support information management, COBie, and digital handover workflows.

Getting started

Create and access

Create an account where enabled, open the available tools and choose the workflow you need.

Upload an IFC file

Upload only the model data needed for the task and allow the processing step to complete.

Review and download

Understand file processing messages, download outputs and remove or replace files where applicable.

IFC checking workflow

  1. Prepare the IFC export
  2. Upload the model
  3. Run available checks
  4. Review warnings and failures
  5. Export results
  6. Feed issues back to the authoring team
  7. Re-check after correction

Common checks

IFC entity checks

Review whether objects are exported using useful IFC entities.

Naming convention checks

Check naming consistency against agreed project patterns.

Property set checks

Identify missing, empty or inconsistent property data.

Classification checks

Review classification references and gaps.

Storey and spatial structure checks

Inspect building, storey and containment structure.

COBie-related checks

Review handover fields and asset information readiness.

Type and component data checks

Compare type-level and component-level information.

Proxy object review

Find proxy objects that may reduce downstream usability.

Data extraction

IFC Toolkit can help extract model data into structured schedules or spreadsheets for element review, property review, COBie support, classification review, asset data checks and QA reporting.

Preparing good IFC files

  • Use agreed project naming standards.
  • Export correct IFC entities where possible.
  • Avoid unnecessary proxy objects.
  • Populate required properties before export.
  • Use consistent classification references.
  • Check spatial structure before issuing.
  • Coordinate IFC export settings across disciplines.

Troubleshooting

File will not process

Check the file extension, export validity and whether the file has finished uploading.

IFC file is too large

Try a reduced, discipline-specific or anonymised test export where suitable.

Missing properties

Confirm the authoring model contains the data and that the IFC export mapping includes it.

Incorrect entity types

Review authoring object categories and IFC export settings.

Unexpected blank values

Check whether values are stored at type level, component level or in a different property set.

Classification not appearing

Confirm the classification reference is applied and included in the IFC export.

Exported data differs from the model

Review export settings, model filters and whether calculated values are included.

Future documentation structure

User guides

Planned guidance for everyday users.

Coming soon

Technical references

Planned reference notes for checks and outputs.

Coming soon

Example workflows

Planned step-by-step model QA examples.

Coming soon

Release notes

Planned change history for public releases.

Coming soon

FAQs

Planned answers to common workflow questions.

Coming soon

API documentation

Planned if API access is made available.

Planned

Ready to test a model?

COBie QA / QC checker

The native COBie QA / QC tool validates uploaded .xlsx workbooks against configurable COBie worksheet definitions, rule packs, required fields, PickLists, cross-sheet references and practical asset data quality checks.

Preparing a workbook

Use a COBie workbook with standard worksheets such as Contact, Facility, Floor, Space, Type, Component, System, Attribute and PickLists. Keep row 1 as column headings and avoid merged cells or formulas in handover data areas.

Rule packs

Basic COBie, Strict COBie, Asset handover, ISO 19650 aligned and IFC Toolkit recommended rule packs adjust severity, required sheets, required fields, column order sensitivity, placeholder handling and ExternalIdentifier expectations.

Interpreting results

Errors usually block reliable exchange, warnings identify practical quality risks, and info items highlight review points such as project-specific extra columns. The issue table shows sheet, row, column, rule, actual value and recommended correction.

Exports and temporary files

After validation you can download an Excel QA report, CSV issue list and, where enabled, a marked-up workbook with highlighted cells and comments. Uploaded COBie workbooks and generated reports are temporary session files and are not retained permanently.

Limitations

The checker supports COBie validation and QA workflows, but it does not guarantee project, contractual, client, ISO 19650, security, or asset information compliance by itself. Project teams remain responsible for checking against their own AIR, EIR, BEP, exchange information requirements, security protocols and contractual obligations.